Pretty quiet evening. I went to an open house for a gym that is trying to drum up membership, then stopped by IKEA on the way home. I picked up a table for my workshop.
I had to cut out a section to fit it around the Radon mitigation system (that vertical white pipe in the center)
I had to cut out a section to fit it around the Radon mitigation system (that vertical white pipe in the center)
I thought the corrugation was interesting. The table top cost $10 from the As-Is section (the table legs cost $17.50) because it had some scratches on the top. I'm going to do a lot worse to it. Already have, in fact.
No comments:
Post a Comment